The Flexsol team completed a project to install a double membrane cover for a biogas plant at the bioenergy complex.
The work was carried out in three stages: design, production and installation. The project was developed and implemented individually for the client, according to the current regulatory documentation. Of the 10 gas holders installed by the Germans at the company, 3 needed to be replaced.
The gas holder is used as a gas-tight covering of the fermenter and performs the function of gas collection. The outer dome has high resistance to ultraviolet light, is resistant to ignition, and has high elasticity.